|
|
 |
 |
Tunnel Unterwald: |
| |
|
| |
In September 2001, the imaging system was applied under real site conditions for the first time at the
railway tunnel site Unterwald.
|
| |
|
| |
 |
| |
|
| |
 |
| JointMetrix3D data acquisition |
| |
 |
 |
| Tunnel
face with structural map |
Subdivision of the tunnel face into
homogenous areas |
|
| |
|
| |
|
|
|
|